Skip to content

Come see us at RE+ 2026Las Vegas, November 17–19 · Booth C7082, Central Hall

Read more about RE+ 2026 · Booth C7082

Voltra Data Center Cloud

Run more compute on the power you already have.

DCIM from the rack to the grid, with a power cap that keeps the site under its limit.

Get Started

Read the whole data center, from meters, batteries and cooling to PDUs, racks, servers and GPUs, in one live model for operations, power and capacity.

One platform, from the rack to the grid.

Connect everything behind the meter.

Fabric reaches each device over the local network, a gateway or its vendor cloud.

  • Switchgear
  • Transformers
  • Generators
  • Transfer switches
  • UPS
  • Batteries & inverters
  • Solar & inverters
  • Fuel cells
  • Protection relays
  • Breakers
  • Meters
  • Cooling & HVAC
  • PLCs
  • Rack PDUs
  • Servers
  • GPUs
  • Network switches
  • BMCs & sensors
  • Load banks
  • Modbus
  • BACnet
  • DNP3
  • SNMP
  • Redfish
  • IPMI
  • OPC UA
  • IEC 61850
  • IEEE 2030.5
  • SunSpec
  • MQTT
  • OCPP
  • SCADA
  • BMS & EPMS
  • Vendor REST
  • Vendor clouds

Prove it in shadow mode, then let it hold the cap.

It sheds load in the order you approve, and never touches tenant IT.

Four layers of flexibility, from the GPU to the grid.

Batteries cover the fast changes, so workloads keep their SLAs.

  • Workload scheduling

    Place, defer and checkpoint jobs for deep flexibility over minutes to hours.

  • GPU power management

    Per-device caps and rack ramp profiles, applied in milliseconds to seconds.

  • Batteries and inverters

    Reactive power and ride-through for the utility’s grid code, answered within a cycle.

  • Facility power and cooling

    Metered PDUs, transfer switches and the thermal headroom of the cooling plant.

Data Center Cloud runs on Fabric.

Fabric connects the plant; Data Center Cloud holds the power cap on top of it.

Voltra Fabric

How Fabric works
  • Connect

    Devices over energy, industrial and IT protocols, through device profiles.

  • Model

    Every device and system as one vendor-agnostic graph.

  • Configure

    Devices made to work together from the model.

  • Maintain

    Connections and the model kept current as firmware and sites change.

  • Chargers
  • Batteries
  • Solar & inverters
  • Meters
  • Switchgear
  • Generators
  • UPS & PDUs
  • Cooling & HVAC

Energy software for the electrical side of your data center.

Cinnabar DC1’s power chain from the PG&E service at 4.6 of 7.2 MW through two transformers, UPSs and PDUs to Row A at 69 of 129 kW and Row B at 83 of 129 kW.
Ask about custom integrations

Works with the plant you already own.

Your DCIM and BMS keep their jobs.

Line drawing of a data center campus: substation, switchgear, generators, UPS, data halls and cooling.
  • Vertiv
  • Schneider Electric
  • Eaton
  • ABB
  • Siemens
  • GE Vernova
  • SEL
  • Mitsubishi Electric
  • Caterpillar
  • Cummins
  • Kohler
  • Generac
  • Carrier
  • Trane
  • Supermicro
  • Dell
  • NVIDIA
  • Fluence
  • Tesla

Start in shadow mode, then hand over control.

Start on Fabric, and turn on the cap once your team has checked the shadow results.